The challenge
A zero-lot-line site with no laydown space and an active street on two sides.
Our solution
Just-in-time deliveries, a tower crane positioned inside the footprint and a detailed traffic-control plan approved by the city.
The result
Topped out on schedule and completed with zero lost-time safety incidents.