The challenge
The existing single-story structure and foundation were never designed to carry a second floor.
Our solution
Engineered reinforcement of the foundation and bearing walls, a new roof framed in two days, and full weather protection before the old roof came off.
The result
Three bedrooms and a bath added in 4 months, with the family living at home the entire time.